Industrial facilities use more than 30% of all of the energy consumed in the United States. Energy used in industrial buildings and manufacturing processes is a large percentage of the overall operating costs. Increased energy efficiency in industrial facilities can produce significant savings that go to the bottom line.
Chart Chart

Next, consider upgrading older, less efficient equipment and installing controls on lighting and building equipment. Many of these upgrades are eligible for incentives that can reduce capital costs and shorten the payback period, such as:

Minimize Air Infiltration

Minimize Air Infiltration

One major source of energy loss for manufacturing facilities can be air infiltration through open loading docks and doors. Consider the use of strip curtains and/or controls to minimize air losses.

Learn more about our custom buildings program
Upgrade to Energy-Efficient Lighting

Upgrade to Energy-Efficient Lighting

Retrofit lighting in manufacturing and warehousing areas with energy efficient lights and fixtures that improve light quality, reduce energy consumption, increase worker productivity and improve plant safety.

Learn more about our lighting program
Install Lighting Controls

Install Lighting Controls

Whether occupancy sensors or the addition of skylights and daylighting controls are a better option, controls to adjust lighting levels as needed can produce large energy savings.

Learn more about our lighting program
Install Variable Frequency Drives

Install Variable Frequency Drives

Install variable frequency drives (VFDs) on motors and pumps to reduce energy consumption and save money.

Learn more about our custom equipment program

Real World Savings

Equipment Sales and Manufacturing

Equipment Sales and Manufacturing

Project Description

Compressor Optimization and Replacement

  • Equipment Cost: $8,388
  • Incentive: $4,988
  • Annual Savings: 99,767 kWh
  • Payback with Incentive: 4 months*
*Payback calculated using $.10 / kWh electricity cost

Plastics Manufacturer

Plastics Manufacturer

Project Description

Pump Replacement & Repair, Addition of VFDs & Controls

  • Equipment Cost: $14,734
  • Incentive: $7,367
  • Annual Savings: 185,333 kWh
  • Payback with Incentive: Less than 6 months*
*Payback calculated using $.10 / kWh electricity cost

Lumber Manufacturer

Lumber Manufacturer

Project Description

Replacement of Interior Lighting with LED

  • Equipment Cost: $7,098
  • Incentive: $2,537
  • Annual Savings: 50,743 kWh
  • Payback with Incentive: Less than 1 year*
*Payback calculated using $.10 / kWh electricity cost

Sources: E-Source

Contact Us

Sodexo is the designated program implementer for commercial and industrial energy efficiency programs for FirstEnergy’s Pennsylvania utilities. This website is maintained by Sodexo
The costs of energy efficiency programs are recovered through customer rates in accordance with PA Act 129 of 2008. For a complete list of commercial, industrial, residential, and low-income energy efficiency programs, please visit energysavePA.com. FirstEnergy’s Pennsylvania utilities, their parents, subsidiaries, employees, affiliates and agents assume no responsibility for the performance of the equipment or equipment warranty, the quality of the work, labor and/or materials supplied, and/or the acts or omissions of any contractor.